Welcome to The Wet Works - Complete Marine Solutions
 

BEP Battery Distribution Cluster - Twin Engine - 3 Battery Bank

This system is designed for twin engine installations. It will allow the port engine to charge the port start battery and the house battery when the VSR is engaged. It will also allow the starboard engine to charge the starboard start battery and the house battery when the starboard VSR is engaged giving a combined charge from two engines into the house battery until the voltage regulators on both engines control the charge. It will also allow the house battery to be charged if steaming on one engine.

Specifications

  • Continuous rating: 275 Amps DC
  • Intermittent rating: 455 Amps DC
  • Cranking rating: 1250 Amps DC
  • Voltage rating: 48 Volts DC
  • Operation: On/Off
  • Mounting: Recessed or Surface
  • Termination stud size: 2 x 3/8” (10mm)
Dimensions
  • Length: 204mm
  • Width: 136mm
  • Height: 101mm

 


Continue Shopping or Checkout



Related Items